01 / RizVinil
From rice husks
to a new raw material.
A flexible PVC sheet that incorporates rice husk waste into its composition, turning agro-industrial waste into a raw material.

A solid and sustainable future
Energy, materials, people and partnerships are part of our work. Explore Plastvinil’s initiatives related to 12 Sustainable Development Goals.
Take a closer lookBrazil’s Free Energy Market
with a focus on clean, renewable sources
SDGs related
to Plastvinil’s initiatives
Materials and packaging
in reuse initiatives
Innovation built together
From recovering waste to development with partners: discover two projects related to SDGs 9 and 17.
01 / RizVinil
A flexible PVC sheet that incorporates rice husk waste into its composition, turning agro-industrial waste into a raw material.
02 / Natura case study
Developed by Natura, Sak’s, Braskem, Inbra and Plastvinil, the case study is an entrant in the First IBPVC Sustainability Award.
Participation in progressEvent scheduled for .
From origin to the next cycle
Explore the commitments that connect energy, materials, processes and end-of-life management.
01 · Energy
Participation in Brazil’s Free Energy Market focuses on clean, renewable energy. This initiative is part of managing the resources used in production.
Check the documentation02 · Raw materials
The partnership with Braskem to use WENEW resin enables post-consumer recycled material to be incorporated into products. Availability and composition must be checked for each range and configuration.
Assess my project’s composition03 · Processes and people
Plastvinil’s initiatives relate to 12 SDGs. People, processes and governance are part of this work, from supporting vocational training to resource management.
Explore actions by SDG04 · New cycles
The partnership with eureciclo forms part of the packaging recovery offset initiatives. The programme for trade fair and event materials promotes reuse and recycling, subject to participation conditions.
Discuss reverse logistics
SGS · ODS 2030 Today
Plastvinil presents the SGS ODS 2030 Today institutional seal and brings together initiatives related to 12 Sustainable Development Goals of the 2030 Agenda.
Environmental, social and governance principles guide the company’s development. The documentation helps your team understand the scope of these commitments in supplier qualification processes.
For supplier qualification, request the current version, its validity period and applicable scope. The institutional seal is a visual reference for the programme.
From initiative to your application
Company practices and product characteristics each have their own scope. Select a topic to see what to consider for your project.
Participation in Brazil’s Free Energy Market with a focus on clean, renewable energy, as part of managing the resources used in production.
Request documentation covering operational energy use and the reference period required by your process.
The partnership with Braskem to use WENEW resin enables post-consumer recycled material to be incorporated into products.
Specify the range and composition requirement. The application and recycled content are assessed for each reference and configuration.
The partnership with eureciclo is part of the reverse logistics initiatives for packaging recovery offsets.
Request documentation explaining the period, scope and criteria for packaging recovery offsets.
The reverse logistics programme for materials used at trade fairs and events promotes reuse and recycling.
Discuss the material, its condition after use, volume and location before arranging its return.
Use of plant-based plasticisers to replace fossil-based alternatives, depending on the formulation.
Specify the composition requirement. The team assesses the availability of the formulation and the reference’s documentation.
Initiatives reported by Plastvinil. View company information
Documentation for your project
Supplier qualification, material composition or a customer requirement: identify the document your assessment needs.
Request the current certificate and details of its scope and validity period.
02 / MATERIALCheck the material’s compositionSpecify the range, reference and technical requirement.
03 / END-OF-LIFE MANAGEMENTAsk about reverse logisticsDescribe the material, volume and project location.